doku:projects [2023/12/21 09:28] – [Project extensions] goldenbergdoku:projects [2023/12/21 09:32] – [Project expiry] goldenberg
Line 167: Line 167:
 **Login disabled:** Three month after job submission, a mail is sent informing about login being disabled. At that point, all user logins to the clusters belonging to that project are disabled. So far, all data belonging to a project was kept indefinitely after the project ran out - but this can not be guaranteed as total storage space might run out. It is therefore highly recommended to back up all relevant data before that point. **Login disabled:** Three month after job submission, a mail is sent informing about login being disabled. At that point, all user logins to the clusters belonging to that project are disabled. So far, all data belonging to a project was kept indefinitely after the project ran out - but this can not be guaranteed as total storage space might run out. It is therefore highly recommended to back up all relevant data before that point.
  
-If the project shall continue, an extension can be requested. That can even be done after the project has run out. +If the project shall continue, an extension can be requested. That can even be done after the project has run out. Testprojects can only be extended for short times (30 - 60 days usually), other projects for a maximum of one year at a time. 
 + 
 +**Auto-extension:** If a project (that is neither test nor private) has a large amount of core-h left available, it is automatically extended once for 6 month.
  
  
  • doku/projects.txt
  • Last modified: 2024/02/20 20:26
  • by goldenberg