The most recent version of this page is a draft.DiffThis version (2017/07/06 10:29) is a draft.
Approvals: 0/1

This is an old revision of the document!


After the technical review has been positively completed, the project is then reviewed by the steering committee. If the steering committee approves of the project, the project manager can create user accounts. All user accounts associated with the project have a maximum runtime of 1 year. The project runtime can be extended if necessary. This requires a project report to be filed with the steering committee.

  • faq/access.1499336958.txt.gz
  • Last modified: 2017/07/06 10:29
  • by ir